  • 14 September 2026

    September 2026 · Vetting checklist

    How to Vet a BS 5975-Compliant Temporary Works Firm

    A contractor checklist for appointing a temporary works engineering firm under BS 5975-1:2024 and BS 5975-2:2024 — competency, checking, packs, permits and named engineer. Not a league table.

  • 14 September 2026

    September 2026 · Case study

    Excavation Support and Propping: From Brief to Permit

    Anonymised case study: a late propping and excavation-support scheme on a refurbishment — design brief, Cat 0–3 check, residual risk and permit-to-load, written for TWCs and site engineers.

  • 14 September 2026

    October 2026 · Positioning

    SME vs Tier-1 Temporary Works Providers

    When a named Chartered Civil Engineer is the right temporary works appointment, and when a national multi-discipline house is. A contractor briefing on delivery model, checking and who actually stamps the pack.

  • 14 September 2026

    October 2026 · Comparison

    Andun Alternatives for Temporary Works Design

    A fair comparison for clients searching Andun alternatives: what Andun is known for, when a named Chartered Civil Engineer SME is a better fit, and how to choose without treating one firm as the default.

  • 23 August 2026

    Archive

    BS 5975:2024 compliance: what UK contractors need in 2026

    Duty holders, procedures, registers and permits under the two-part standard.

Editorial calendar

The next slots are already named

Two pieces per cycle. September and October are published. November is planned so the cadence does not depend on a last-minute idea.

September 2026

October 2026

November 2026

  • Planned

    Working platforms after BRE 470: what the calculation is not

    Plant loads, ground information and permit-to-load.

  • Planned

    Cat 2 vs Cat 3: when the check has to change organisation

    Consequence, independence and the register.