How to Vet a BS 5975-Compliant Temporary Works Firm
A contractor checklist for appointing a temporary works engineering firm under BS 5975-1:2024 and BS 5975-2:2024 — competency, checking, packs, permits and named engineer. Not a league table.
14 September 2026
September 2026 · Case study
Excavation Support and Propping: From Brief to Permit
Anonymised case study: a late propping and excavation-support scheme on a refurbishment — design brief, Cat 0–3 check, residual risk and permit-to-load, written for TWCs and site engineers.
14 September 2026
October 2026 · Positioning
SME vs Tier-1 Temporary Works Providers
When a named Chartered Civil Engineer is the right temporary works appointment, and when a national multi-discipline house is. A contractor briefing on delivery model, checking and who actually stamps the pack.
14 September 2026
October 2026 · Comparison
Andun Alternatives for Temporary Works Design
A fair comparison for clients searching Andun alternatives: what Andun is known for, when a named Chartered Civil Engineer SME is a better fit, and how to choose without treating one firm as the default.
23 August 2026
Archive
BS 5975:2024 compliance: what UK contractors need in 2026
Duty holders, procedures, registers and permits under the two-part standard.
Editorial calendar
The next slots are already named
Two pieces per cycle. September and October are published. November is planned so the cadence does not depend on a last-minute idea.
September 2026
Published
How to vet a BS 5975-compliant temporary works firmContractor checklist — not a league table.
Published
Excavation support and propping: from brief to permitAnonymised case study from a live strip-out.
October 2026
Published
SME vs tier-1 temporary works providersWhen a named Chartered Engineer is the right appointment.
Published
Andun alternatives for temporary works designFair comparison of specialism, delivery and named designer.
November 2026
Planned
Working platforms after BRE 470: what the calculation is not
Plant loads, ground information and permit-to-load.
Planned
Cat 2 vs Cat 3: when the check has to change organisation
Consequence, independence and the register.