Case Studies
Example work
Anonymised, illustrative examples of the type of temporary works support provided. Details are generalised and do not identify clients or projects.
Representative project — anonymised
Omitted braced-bay steel during generator installation — major London airport energy project
The challenge. Permanent braced-bay steel had to be omitted at two plant towers so generators could be installed — but that bracing formed part of the frame's lateral stability, leaving columns unrestrained at the top level. The specialist lift contractor's plan then identified a clash between the generator lift envelope and the remaining tower steel, and disagreed with the proposed leave-down strategy.
The temporary works requirement. Demonstrate stability of the frame at every stage of the works; replicate the omitted lateral load path with temporary bracing without overstressing permanent members; and turn the omitted bay into a designed lift corridor kept clear of the full lift envelope (generator, rigging and operational clearances).
Information worked from. The permanent works engineer's structural drawings and imposed-loading plans, the lift contractor's lift plan and section views, gantry loading plans and the project correspondence trail.
The approach. A formal design-review report through controlled revisions: every comment from the permanent works engineer (a tier-one international consultancy) answered and closed out in a tracked schedule; the lift-envelope clash resolved through a designed corridor strategy; a staged temporary bracing scheme with a documented remove-versus-retain decision; and a full working methodology, site risk assessment and revised ITP with hold points.
Where it landed. The strategy was accepted in principle by the permanent works engineer, and the developed scheme — staging, bracing and lift corridor — was issued for delivery, with contractor duties under the contract and CDM 2015 explicitly preserved.
Limitations: project details anonymised for commercial confidentiality; design subject to the project temporary works procedure and competent checking throughout.
Further illustrative examples
Late propping scheme on a refurbishment
Challenge: A temporary propping arrangement was needed quickly to keep a strip-out on programme.
Support provided: Calculations and details prepared and issued for checking, with a clear design brief and residual-risk notes.
Outcome: Scheme available for competent check without holding the programme.
Piling mat for a tracked rig
Challenge: A working platform was required before a piling rig could be mobilised to site.
Support provided: Platform assessment with reference to BR 470, subject to ground information, with permit-to-load input.
Outcome: Clear platform basis and certificate input for sign-off.
RAMS & ITP tightening before submission
Challenge: Method statements and ITPs needed sharper hold points before client submission.
Support provided: Marked-up RAMS/ITP review with prioritised comments and clearer responsibilities.
Outcome: Stronger, clearer documents ready for the author to finalise.
Virtual audit for a remote project
Challenge: An external check on temporary works control was wanted without a site visit.
Support provided: Remote audit using photos, records and a video walk-round against the register.
Outcome: Ranked findings and priority actions delivered quickly.
Scaffold interface coordination
Challenge: A designed scaffold interacted with propping and excavation near the structure.
Support provided: Interface review of ties, loads and ground bearing, coordinated across trades.
Outcome: Clearer design responsibility and a coordinated interface.
Setting up BS 5975 control
Challenge: A new project needed a workable temporary works procedure and register.
Support provided: Procedure, register template and role guidance with reference to BS 5975:2024.
Outcome: A practical system the team could actually run.
Have a similar challenge? Tell us about it — you will get a practical view on approach and turnaround.
In the field
Temporary works design, on site
Examples of the design and control work behind real temporary works — calculations, load paths and detailing taken from drawing board to site.
Illustrative of the type of work supported. Boards shown are example designs; all designs require competent review under the project temporary works procedure.
On YouTube
Temporary works, explained on video
Short, practical videos on temporary works design, BS 5975 control, working platforms and common site pitfalls. Subscribe so you do not miss new ones.
@temporaryworksconsulting
Scope & competence note
Temporary Works Consulting & Design Ltd provides design, advisory, training and support services subject to agreed scope, competence requirements and project-specific information. Digital products, books, templates and tutoring support do not replace formal appointment, competent design review, independent checking, statutory duties or project-specific approval under the project temporary works procedure.
Get started
Need Temporary Works Support Now?
Tell us the item, the programme date and what information you have. You will get a practical, honest response — not a sales pitch.