Design Checking

Temporary Works Design Checking Support

A second competent pair of eyes on temporary works calculations and details — confirming loads, assumptions and intent before work proceeds.

What this covers

Checking is where avoidable errors are caught. We provide design checking support and Category check input that confirms a scheme does what it claims, with reference to BS 5975:2024 and the agreed check category.

  • Review of loads, load paths and assumptions
  • Confirmation of standards and design basis used
  • Check of stability, bearing and connection details
  • Identification of gaps, queries and residual risks
  • Support for Category 0–3 checking arrangements
  • Clear check status and comments for the register

How we word it

  • Check category and scope are agreed in writing before work starts.
  • Checking supports — and does not replace — the project's statutory duties and approval process.
  • A competent review remains required under the project temporary works procedure.
Engineer checking a falsework design against the build on site

Typical deliverables

  • Check comments and query log
  • Marked-up calculations / sketches where needed
  • A clear check statement and outstanding items
  • Input to the Temporary Works Register check status

Check categories

CAT 0–3 design checks, explained

BS 5975:2024 grades design checks by complexity and risk. The category is set by the project's designated individual / temporary works procedure — we help you resource it.

Cat 0 & Cat 1

Restricted to standard solutions (Cat 0) and simple designs (Cat 1). Checked by another competent person — often within the same organisation. We provide fast, documented Cat 1 check support with a clear check statement for the register.

CAT 2 temporary works check

More complex or non-standard designs — checked by an individual not involved in the original design. We coordinate and deliver Cat 2 checks: independent review of loads, load paths, stability and details, with a query log and check certificate input for the register.

CAT 3 temporary works check

Complex, innovative or high-consequence designs — an independent check by a separate organisation, working from first principles with independent calculations. We scope, commission and manage Cat 3 checks with established checking engineers, and close out the certificate trail.

Not sure which category?

Send the scheme through the Express Quote — we will give a view on the appropriate check category as part of scoping, referencing your project's temporary works procedure.

When contractors use this

  • An independent or higher-category check is required
  • A design has arrived late and needs a fast, competent review
  • In-house resource is stretched and needs support
  • A scheme has changed and the check needs revisiting

Move this forward

Send the item, the programme date and what information you already have (drawings, loads, ground info, constraints). You will get a practical view on scope, approach and turnaround.


Related services

Scope & competence note

Temporary Works Consulting & Design Ltd provides design, advisory, training and support services subject to agreed scope, competence requirements and project-specific information. Digital products, books, templates and tutoring support do not replace formal appointment, competent design review, independent checking, statutory duties or project-specific approval under the project temporary works procedure.

Get started

Need Temporary Works Support Now?

Tell us the item, the programme date and what information you have. You will get a practical, honest response — not a sales pitch.

Get a Quote