This is a blank template for early planning and learning. It is not a temporary works design and must not be used for construction. Complete it under your project's temporary works procedure with reference to BS 5975:2024. All temporary works must be designed, checked and permitted under that procedure. For a design, request one from a competent temporary works designer.
Template version 1 · 27 October 2026 · Temporary Works Consulting & Design Ltd · no sponsor mark on this sheet.
What this permit is for
The compliance article: a permit to load authorises the application of loads after confirming the temporary works have been erected correctly. Copy the loads and restrictions from the design. Do not invent them on this sheet.