Checklists

Checklists and permit templates

Four blank sheets. Print them or save them as a PDF. Adapt every line to the project temporary works procedure before anyone uses it.

Last reviewed 27 October 2026. Drawn from pages already published on this site.

Key points

  • Each sheet is marked TEMPLATE – NOT A PERMIT AND NOT FOR CONSTRUCTION.
  • Sponsor wording stays on this page. It is not printed on the sheet.
  • Permit to alter is described in the compliance article. There is no separate template for it yet.

TWC appointment and live checks

Who is appointed, the duties the compliance article names, and a place to record the inspections the procedure already requires.

Open the TWC sheet →

TWS pre-load inspection

A check that the item matches the approved design, before anyone treats it as ready to load.

Open the TWS sheet →

Permit to load

Authorises load only after erection is confirmed. Loads and restrictions are copied from the design.

Open the permit to load →

Permit to strike

Authorises removal only after the permanent structure is confirmed ready to take the load.

Open the permit to strike →