This is a blank template for early planning and learning. It is not a temporary works design and must not be used for construction. Complete it under your project's temporary works procedure with reference to BS 5975:2024. All temporary works must be designed, checked and permitted under that procedure. For a design, request one from a competent temporary works designer.
Template version 1 · 27 October 2026 · Temporary Works Consulting & Design Ltd · no sponsor mark on this sheet.
Appointment
The compliance article says the principal contractor is accountable for appointing the right people, and that the TWC must be competent, not merely available. This sheet does not decide competence.
Duties named on this site
Live checks
The excavation-support page says daily inspection remains a site responsibility for excavations. For other items, record whatever inspection the project procedure requires. Do not treat this list as a new inspection frequency.