This is a blank template for early planning and learning. It is not a temporary works design and must not be used for construction. Complete it under your project's temporary works procedure with reference to BS 5975:2024. All temporary works must be designed, checked and permitted under that procedure. For a design, request one from a competent temporary works designer.
Template version 1 · 27 October 2026 · Temporary Works Consulting & Design Ltd · no sponsor mark on this sheet.
Item
The compliance article says the TWS, working under the TWC, checks that temporary works are erected, used and struck in accordance with the approved design. This sheet is the erection check before a permit to load. It does not authorise the load.